Working basis
Service Instructions 967 - 02.0 - 12/2015
9
3 Working basis
3.1 Sequence of the settings
The setting positions for the machine are interdependent.
Always adhere to the specified sequence for the individual setting steps.
Always observe all information on requirements and following settings 
marked at the side with .
3.2 Cable routing
Ensure that all cables in the machine are laid such that moving parts are 
not impaired in their ability to function correctly.
1. Lay any excess cabling neatly in 
proper cable sn
akes.
2. Tie the snakes together using a cable tie.
If possible, bind the snakes to fixed parts.
The cables must be fixed firmly in place.
3. Cut off any protruding part of the cable tie.
NOTICE
Machine damage possible due to incorrect sequence.
Always adhere to the working sequence specified
 in these 
instructions.
NOTICE
Machine damage and malfunctions can be caused by laying 
the cables incorrectly.
Excess cabling may obstruct moving machine parts in their  
ability to function correctly. This will affect 
the sewing function and 
may cause damage.
Lay excess cabling as described above.