M588-00-880 Issue E
Page 118 © Edwards Limited 2015. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
Appendix A2
The following menus are used by the PDT to configure the booster:
Figure A44 - Booster PDT menu configuration items
A2.7.1 Setting the booster to manual operation
The booster can be set to manual mode using the BP Start mode menu item.
1. From the SETUP menu, scroll down and select the Set Sequences menu.
2. Scroll down and select BP Start Options.
3. Select BP Start Mode…
4. Select Manual.
The booster can then be started and stopped using the MB menu item from the Commands menu. Refer to
Section A2.15.
Note: If a booster is manually controlled and the dry pump is stopped then the booster will continue running.
A2.7.2 Changing the booster time delay
The time delay for starting the booster in automatic mode can be configured using the BP start delay menu item to
between 1 and 200 seconds.
Note: It is not recommended to set the delay to less than 20 seconds when the booster is starting after the dry
pump.
A2.7.3 Setting the booster to start when the inlet isolation valve is open
To reduce energy consumption the booster can be configured to only run when the inlet isolation valve is open. The
inlet isolation valve automatically opens when the dry pump is on-process and is closed in Green Mode/Standby mode.
To configure the booster to only be on when the inlet isolation valve is open use the BP delay after menu item and
set the option to Isol valve.