Leakage Current
A designated channel is used for leakage current in one of the following manners
i. Calculated channel
ii. Physical channel measured via IDC channel of a portable unit
Note: I5 nominal value should be configured to suit the expected leakage current value
which is usually a fraction of the nominal phase current.
I5 should be configured according to the mode of work i.e., physical leakage measurement or
calculated leakage as illustrated below.
To apply your changes select to review your changes;
NOTE NOTE NOTE
If you are not logged on as the Administrator, you will not be able to change any of these settings
& you will receive the following error message in your attempt to do so:
Once you have signed on at the Administrator ensure that you select to actually
affect your changes.
see also:
About Quick Configuration
Unit Configuration
Voltage & Frequency