multi EA 5000 Troubleshooting
115
Error Possible cause Remedy
Scattering measurements Dosing faulty Check dosing
Combustion tube contam-
inated or severely crystal-
lized
Clean or replace combus-
tion tube
13.7 Device faults on the CLD 5000
Error Possible cause Remedy
LED in front panel flash-
ing
Ozone generator off
¡ Run-in period of de-
tection module not
yet complete
¡ Wait for the comple-
tion time for the run-
in period of approx
30min to elapse.
¡ Device in standby ¡ Initialize the device
¡ Gas deactivated ¡ Activate gas flow, see
software manual
¡ Module not con-
nected to basic mod-
ule
¡ Connect module (→
"Installation" 97)
¡ No method or
method with no CLD
active
¡ Activate a method
with nitrogen detec-
tion
¡ Other fault causes ¡ Check the condition
of the module under
System
|
Component
test
Pressure error ¡ Gas outlet flow im-
peded
¡ Check the "sample
out" connection for
unimpeded flow
¡ Absorber clogged ¡ Replace absorber (→
"Replacing the ab-
sorber" 148)
¡ Converter worn out/
old
¡ Inform customer ser-
vice department
¡ Pump faulty ¡ Inform customer ser-
vice department
¡ Device leaking or de-
fective
¡ Inform customer ser-
vice department
Exhaust gas temperature
outside range
¡ Run-in period of de-
tection module not
yet complete
¡ Wait for the comple-
tion time for the run-
in period of approx
30min to elapse.
¡ Thermal ozone de-
composer defective
¡ Inform customer ser-
vice department
Heating temperature sen-
sor defective
¡ Thermal ozone de-
composer defective
¡ Inform customer ser-
vice department