EasyManua.ls Logo

Endress+Hauser Analytik Jena multi EA 5000 - Figure 41 Connection of the Heated Gas Transfer Lines to the Sulfuric Acid Container

Endress+Hauser Analytik Jena multi EA 5000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
multi EA 5000 Chlorine analysis with the Cl module
61
Installing the detection module
1
2
3
4
5
6
7
3
5
4
Figure41Connection of the heated gas transfer lines to the sulfuric acid container
1 Safety attachment 2 Sulfuric acid container
3 Hose for measuring gas infeed 4 Connector
5 Banjo bolt 6 Heated gas transfer line
7 Measuring gas transfer to the mea-
suring cell with PTFE connector
} Insert the sulfuric acid container in the holders.
} Route the gas transfer line through the top right opening of the detection module.
} Connect the gas transfer line to the sulfuric acid container:
Insert the thin hose (3) into the sulfuric acid container.
Connect the connector (4) to the sulfuric acid container.
Connect the gas transfer line via the banjo bolt (5) on the connector.
NOTICE!Ensure the proper fit of the conical nipples!
} Place the safety attachment on the sulfuric acid container and attach the safety clip.
} Connect hose 20 with the safety attachment. Connect the hose to the measuring cell
later.
} Connect the gas transfer line in the basic module:
Route the free end of the gas transfer line through the top left opening on the
basic module.
Connect the gas transfer line to the auto-protection valve assembly.
Connect the heating cable of the gas transfer line to its socket.

Table of Contents

Related product manuals