EasyManua.ls Logo

Endress+Hauser Analytik Jena multi EA 5000 - Maintenance of the Auto-Protection Valve Assembly; Installing;Removing the Auto-Protection Valve Assembly

Endress+Hauser Analytik Jena multi EA 5000
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and care multi EA 5000
134
14.3 Maintenance of the auto-protection valve assembly
CAUTION
Risk of injury from falling components
The user can be injured if the assembly falls down during maintenance.
¡ Exercise extreme caution during maintenance of the auto-protection valve assem-
bly.
14.3.1 Installing/removing the auto-protection valve assembly
CAUTION
Risk of burns from the hot furnace and the gas transfer line.
¡ Switch off the device and allow it to cool before performing maintenance.
Check the condition of the auto-protection valve assembly as follows:
For better clarity, the work steps are displayed with the side panels removed. However,
for the installation and removal of the auto-protection valve assembly it is not necessary
to remove the side panels.
} Exit the multiWin program, switch off the basic module via the power
switch and shut off the gas supply.
} Tilt the combustion furnace into the horizontal position.
} Open the pneumatic seal at the auto-protection valve assembly. Flip the
toggle switch up.
} Remove the combustion tube or pull it out some distance of the combus-
tion furnace.
1
2
3
4
} Unscrew hose 8 (1) from the connection.
} Press the ring on the connector of hose 11 (2) down and pull the hose
out of the connection.
} Depending on the configuration, detach the connection of the membrane
dryer and the gas transfer line:
Unscrew the gas transfer line (3).
Loosen the knurled screw (4) on the membrane dryer connection
slightly and pull the connection out toward the bottom.

Table of Contents

Related product manuals