EasyManua.ls Logo

ESAB 100i - Page 54

ESAB 100i
254 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
100i / 200i / 300i / 400i
54 INSTALLATION Manual PN: 0560956430
NOTE!
If you need to replace a gas or water fitting all inlets and outlets of the aluminum manifold are 1/4” NPT
(United States National Pipe Thread) into which are screwed the various adapters.
4. Connect the ground cable to rear of Gas Selection Console shown in previous illustration.
5. Connect Control cable from the Power Supply to J56 on the front of the Gas Selection Console as shown below. The Fiber
Optic cable will be covered a little later.
Art # A-09142_AB
6. Install WMS Water Softener Kit in the line that feeds the inlet side of the Gas Selection Console. Mount the softener and
bracket on the power supply where the provided 2’ hose can reach to the Gas Selection Console. Mounting in another
location is possible with a customer provided hose. Below is typical customer added hose and installation.
Art # A-09655

Table of Contents

Other manuals for ESAB 100i

Related product manuals