EasyManua.ls Logo

Flow MACH 300 - Page 103

Flow MACH 300
185 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Apply a thin, even layer of BLUE LUBRICANT to the both sides of the poppet seat. Install the
poppet seat—such that the small hole faces toward the poppet—into the valve body. Install the
-014 O-ring into the groove to hold the poppet seat in place.
6. Apply a thin, even layer of BLUE LUBRICANT to the external threads of the valve body, and
then thread it onto the nozzle body by tightening the gland nut Leave this connection hand tight
for now.
© 2021 Flow International Corp.
Retrieved from Flow KB on April 15, 2021 PST
On/off valve repair

Table of Contents

Related product manuals