CHAPTER 3
Small Configuration
Storing, Unpacking, and Inspecting Equipment
3-21
FLASHWAVE 7500 Release 6.1
Equipment Installation
Fujitsu and Fujitsu Customer Use Only
FNC-7500-0061-200
Issue 1, May 2009
2 Before unpacking the equipment rack, inspect the container (see Figure 3-14 [p. 3-21]) for
signs of shipping damage. Claims for shipping damage must be filed with the transportation
company in accordance with their published procedure.
Note: A shipping label is located on the front of the equipment rack container. Compare this with the
shipping documents.
3 Is this the correct shipment for this location?
If YES:
Continue with Step 4 [p. 3-21].
If NO:
Go to Step 16 [p. 3-23].
4 Using all data sheets and job engineering drawings, verify that the information matches the
installation site.
5 Using industrial shears, cut the two shipping bands from the container. See Figure 3-14
[p. 3-21] for the location of the shipping bands.
After the last shipping band is cut, the top of the shipping container will fall away.
Figure 3-14: Example of an Equipment Rack in Shipping Container