CHAPTER 3
Small Configuration
Installing the Rack
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
3-26
Fujitsu and Fujitsu Customer Use Only
6 Is the floor anchor for a concrete floor?
If YES:
Go to Step 7 [p. 3-26].
If NO:
Go to Step 14 [p. 3-26].
7 In accordance with the dimensions of the anchor to be used, drill the holes in the concrete
floor.
8 Clean the drill shavings from the holes.
9 Install an anchor in each of the holes.
10 Remove any debris from the area in which the rack will be mounted.
11 Move the rack into position, aligning each of the holes in the base of the rack to the anchors.
12 Install the mounting bolts into the anchors, and tighten them to within 0.5 inch of the
equipment rack baseplate. Do not fully tighten at this time.
13 Go to Step 19 [p. 3-27].
14 Drill the holes in the raised floor in accordance with the dimensions of the mounting bolts
being used.
Figure 3-16: Example Diagram—7 feet x 19 inch Equipment Rack Floor Dimensions
21.94
1.76
R0.50
R0.83
45°
5.24
4.79
17.50
2.17
4.19
1.51
5.18
Note: All Dimensions are in inches.