CHAPTER 4
ETSI Configuration
Installing the Rack
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-16
Fujitsu and Fujitsu Customer Use Only
Figure 4-7 [p. 4-16] shows an example mounting diagram. Mounting diagrams will vary
depending on equipment and location.
4 Using a punch and hammer, mark the position where the holes are to be drilled.
5 Determine the type of floor anchor to be used.
6 Is the floor anchor for a concrete floor?
If YES:
Go to Step 7 [p. 4-16].
If NO:
Go to Step 14 [p. 4-17].
7 In accordance with the dimensions of the anchor to be used, drill the holes in the concrete
floor.
8 Clean the drill shavings from the holes.
Figure 4-7: Example Diagram—Equipment Rack Floor Dimensions
198.7 mm
(7.82 in.)
300 mm
(11.81 in.)
88.1 mm 420.8 mm
(3.47 in.)
(16.57 in.)
600 mm
(23.62 in.)
40 mm
(1.57 in.)
45°
205.6 mm
(8.09 in.)
185.8 mm
(7.31 in.)
261.9 mm
(10.31 in.)
AC PWR
FGND
Cutout
Rectangular Opening
in Center of Rack
Zone 7
Zone 5
Zone 3
A PWR
Zone 8
Zone 6
Zone 4
B PWR
LAN, signal, fiber, and
power cutout locations
typical both sides of rack
50.8 mm
(2.0 in.)
Anchor Bolt
Mounting Locations
R 12.7 mm
(R 0.5 in.)
Front
m1718sc_1