EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - Page 234

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
ETSI Configuration
Installing the Rack
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-16
Fujitsu and Fujitsu Customer Use Only
Figure 4-7 [p. 4-16] shows an example mounting diagram. Mounting diagrams will vary
depending on equipment and location.
4 Using a punch and hammer, mark the position where the holes are to be drilled.
5 Determine the type of floor anchor to be used.
6 Is the floor anchor for a concrete floor?
If YES:
Go to Step 7 [p. 4-16].
If NO:
Go to Step 14 [p. 4-17].
7 In accordance with the dimensions of the anchor to be used, drill the holes in the concrete
floor.
8 Clean the drill shavings from the holes.
Figure 4-7: Example Diagram—Equipment Rack Floor Dimensions
198.7 mm
(7.82 in.)
300 mm
(11.81 in.)
88.1 mm 420.8 mm
(3.47 in.)
(16.57 in.)
600 mm
(23.62 in.)
40 mm
(1.57 in.)
45°
205.6 mm
(8.09 in.)
185.8 mm
(7.31 in.)
261.9 mm
(10.31 in.)
AC PWR
FGND
Cutout
Rectangular Opening
in Center of Rack
Zone 7
Zone 5
Zone 3
A PWR
Zone 8
Zone 6
Zone 4
B PWR
LAN, signal, fiber, and
power cutout locations
typical both sides of rack
50.8 mm
(2.0 in.)
Anchor Bolt
Mounting Locations
R 12.7 mm
(R 0.5 in.)
Front
m1718sc_1
Revision 1, June 2009

Table of Contents

Related product manuals