EasyManua.ls Logo

Fujitsu FLASHWAVE 7500 - Page 292

Fujitsu FLASHWAVE 7500
392 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHAPTER 4
ETSI Configuration
Checking Power at Optical/Tributary Shelf
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
4-74
Fujitsu and Fujitsu Customer Use Only
11 Is the DMM measurement between –40 and –57 V DC?
If YES:
Go to Step 12 [p. 4-74].
If NO:
Report as a trouble item to the installation group and repeat voltage checks after trouble is
corrected.
12 Repeat the preceding steps for the remaining Tributary shelves.
13 Check the frame ground connections and readings according to local procedures.
This procedure is complete.
Revision 1, June 2009

Table of Contents

Related product manuals