CHAPTER 2
Core Configuration
Installing Optical/Tributary Shelf, LAS, and Heat Baffle
FNC-7500-0061-200
Issue 1, May 2009
FLASHWAVE 7500 Release 6.1
Equipment Installation
2-30
Fujitsu and Fujitsu Customer Use Only
4 Review Figures 2-1 [p. 2-4] through 2-7 [p. 2-10] and install the heat baffle in the rack where
applicable. Install the heat baffle as shown in Figure 2-16 [p. 2-29].
Note: The heat baffle ensures that air pushed upward through the shelf is deflected to the rear of the
rack. Use two screws on each side of the assembly.
5 Clearly mark or label each Optical/Tributary shelf according to local practice.
Note: The recommended labeling scheme is shown in Figure 2-17 [p. 2-31]. In this scheme, each shelf
is labeled with its shelf AID (for example, OS1 for the Main Optical shelf). As shown, the shelf AID is
determined by shelf position within the hierarchy of LAN connections. Throughout this
documentation, shelves are identified by shelf AID.
This procedure is complete.