EasyManua.ls Logo

GE AKTA avant - Page 292

GE AKTA avant
538 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Phase Properties tab of each of the System CIP phases:4
Enter a note for the first solution (optional).
Enter values for Flow rate, Volume per position and Incubation time.
Define the extent of cleaning by selecting the check boxes.
Note:
For complete cleaning of the Injection valve, select at least one of the sample
inlets and clean the manual injection port using a syringe (see Clean the
manual injection port of the injection valve, on page 294).
Note:
The pH electrode is not included in System CIP, but the flow restrictor is in
line. Refer to Section 7.6.7 Clean the pH electrode, on page307 for instructions
on how to clean the pH electrode.
292 ÄKTA avant User Manual 29035184 AE
7 Maintenance
7.6 Maintenance when required
7.6.2 Perform System CIP

Table of Contents

Other manuals for GE AKTA avant

Related product manuals