EasyManua.ls Logo

GE AKTApure - Page 156

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Insert the waste tubing from all installed modules, in this example Injection valve, Outlet
valve (W, W1 and W2) and the fraction collector, in a vessel.
1
Make sure that the tubing is securely fastened to the ÄKTA pure instrument:2
•
Fasten waste tubing from the valves with the clips on the front of the system.
•
Fasten waste tubing from the Buffer tray with the clips on the rear of the system.
156 ÄKTA pure User Manual 29119969 AB
5 Operation
5.2 Prepare the flow path

Table of Contents