EasyManua.ls Logo

GE AKTApure - Page 169

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Process Picture :4
Click on Sample inlet valve.
Select the position of the inlet to be filled. Start at the inlet position with the highest
number and end at the position with the lowest number.
Result: the sample inlet valve switches to the selected port.
Connect a 25 to 30 ml syringe to one of the purge valves of the pump heads of the
Sample pump. Make sure that the syringe fits tightly into the purge connector.
5
Open the purge valve by turning it counter-clockwise about three-quarters of a turn.
Draw liquid slowly into the syringe until the liquid reaches the sample pump.
6
Close the purge valve by turning it clockwise. Disconnect the syringe and discard its
contents.
7
Repeat steps 2-5 for each sample inlet that is to be used in the method run.8
ÄKTA pure User Manual 29119969 AB 169
5 Operation
5.4 Prime inlets and purge pump heads
5.4.2 Sample pump

Table of Contents

Related product manuals