EasyManua.ls Logo

GE AKTApure - Page 188

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Process Picture:3
•
Click the Mixer valve and select By-pass.
Result: The Mixer valve switches to By-pass position.
If the loop is connected to:4
•
the Injection valve, continue to step 6.
•
the Loop valve, continue to step 5.
In the Process Picture:5
•
Click the Loop valve.
•
Select the position the loop is connected to, for example Position 1.
Result: The Loop valve switches to the selected position.
In the Process Picture:6
•
Click on the buffer inlet valve A.
•
Select the inlet position to be used for sample injection, for example A2.
Result: Inlet valve A switches to the selected port.
188 ÄKTA pure User Manual 29119969 AB
5 Operation
5.7 Sample application
5.7.2 Sample application using a Superloop
™

Table of Contents