EasyManua.ls Logo

GE AKTApure - Page 468

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DescriptionInstruction name
Pump B wash is used to change buffers in the inlet tubing, pump
and mixer.
Note:
Pressing End during Pump wash will terminate both the wash
and the run immediately.
Pressing Continue during Pump wash will terminate the wash
and the run will continue from the point at which the Pump
wash instruction was executed.
An instruction issued when a Pump wash is in progress will not
be executed until the wash is completely finished and all valves
have turned back to the previous positions.
Pump wash cannot be executed when the system is in state
HOLD.
Pump B wash
Sample pump wash is used to change buffers in the sample inlet
tubing and sample pump.
Note:
Pressing End during Sample pump wash will terminate both
the wash and the run immediately.
Pressing Continue during Sample pump wash will terminate
the wash and the run will continue from the point at which the
Sample pump wash instruction was executed.
An instruction issued when a Sample pump wash is in progress
will not be executed until the wash is completely finished and
all valves have turned back to the previous positions.
Sample pump wash cannot be executed when the system is
in state HOLD.
The flow rate should not exceed 10 ml/min if narrow inlet tubing
(I.D. 0.75 mm) is used.
Sample pump wash
468 ÄKTA pure User Manual 29119969 AB
9 Reference information
9.9 Manual instructions
9.9.1 Manual instructions - Pumps

Table of Contents

Related product manuals