EasyManua.ls Logo

GE D20 - Servicing and Maintenance; Routine Maintenance and Inspection; Power Supply Fuse Replacement

GE D20
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D20/D200
Installation and Operations Guide
GE Energy
994-0078-2.00-7 General
118
Full
Servicing
D20/D200
Maintenance
The D20/D200 does not require any scheduled maintenance. Periodic inspection is
suggested to ensure that:
Unit has sustained no accidental physical damage
Airflow is not obstructed
Connectors and cables are intact and firmly attached
Fuses are intact
Battery condition is good
Servicing Tasks
Use this section of the guide for regular servicing and preventative maintenance
inspection tasks:
Locations and standard values of all fuses
How to inspect and replace batteries on the D20ME/ME II main board
D20 Power
Supply Fuses
The D20 Power Supply has one or two field-replaceable fuses.
Replaceable
Fuses
Field-replaceable fuses for the standard chassis-mounted Power Supplies:
Power
Supply
Fuse Fuse Function Replacement Fuse
(¼” x 1 ¼” Time Delay)
F1 +DC Input 12A / 250V 580 – 2004
F2 -DC Input 12A / 250V
F1 +DC Input 12A / 250V 580 – 2005
F2 -DC Input 12A / 250V
F1 Line/+DC Input 4A / 250V 580 – 2006
F2 Neutral/-DC Input 4A / 250V
F1 Line/+DC Input 4A / 250V 580 - 2007
F2 Neutral/-DC Input 4A / 250V
Field Replaceable
Fuses
Field Replaceable
Fuses

Table of Contents

Other manuals for GE D20

Related product manuals