GE Energy
D20/D200
Installation and Operations Guide
General 994-0078-2.00-7
Full
11
Getting Started: Required Steps
Installation
Steps
Follow these steps to install and set up your D20 or D200 system.
Step Action
1
Unpack the system components.
2
Using the Familiarization section of this guide, inspe
ct the D20/D200 for
damage.
Note:
Report any damage immediately to GE Energy. See “Product
Support and Safety” for contact details.
3
Install the D20/D200.
4
Carry out all field wiring connections and jumper settings as set out in
“Connections and Configuration”:
• Power
• Serial and Ethernet cabling
• Field input
and output connections
5
Power-up the D20/D200 and check for normal operation. See “Power-up
and Test”. Some testing re
quires that code and configuration files have
been downloaded to the D20/D200.
6
If the FLASH memory has been deleted or corrupted, then you need to
download the code and configuration files. See “D20/D200 Software
Configuratio
n”.
7
If you downloaded code and configuration files, then go back to step 5
and verify that the D20/D200 is now operating correctly.