EasyManua.ls Logo

GE D20 - Page 99

GE D20
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE Energy
D20/D200
Installation and Operations Guide
General 994-0078-2.00-7
Full
97
Power-up and Test, continued
Procedure
Follow these steps to check that switch-over is functioning correctly for the event of
software failure:
Step Action
1
On the front of the RS-232 Panel, check that CCU A LED is
illuminated, which shows that CCU A is Active.
Note
: Both the PWR A and PWR B LEDs should be illuminated.
2
Connect a WESMAINT cable to the female DB-9 WESMAINT II+ port
on the front panel of the CCU A D20ME/ME II Active board.
3
Attach the other end of the WESMAINT II+ cable to the serial
communications port of the PC or terminal.
4
Login to WESMAINT on CCU A using your the emulator.
Result:
The WESMAINT Main Menu is displayed.
5
Select System Functions on the Main Menu and press ENTER.
Result:
The WESMAINT Function Menu is displayed.
6
Select SWITCH-OVER on the Function Menu and press ENTER.
Result:
A password prompt is displayed.
7
Enter your password and press ENTER. The default is “control”.
Result:
The CCU Switch-Over display shows: “choose switch-over
(<ctrl>-V) to begin”.
8
Press CTRL-V.
Result:
A confirmation message shows: “Confirm Yes/No”.
9
Type Yes and press ENTER.
Result:
Fail over occurs
10
Verify the switch-over: see “Procedure”, page 98.

Table of Contents

Other manuals for GE D20

Related product manuals