To configure leak test:
1. Set the Utility to Leak Test.
2. Select:
SETTINGS >> LEAK TEST
3. Set the following periods
WAIT TIME:
The time before the test starts in
hours:minutes:seconds (hh:mm:ss).
TEST TIME:
The period of the leak test in
hours:minutes:seconds (hh:mm:ss)
4. Use to start the Leak Test
5. Use to stop the “Ramp” cycle
Note: To set the Leak Test options, a pressure module must
be correctly installed.