D20E ETHERNET I/O MODULE INSTRUCTION MANUAL GE INFORMATION 35
D20E Ethernet I/O Module
Chapter 2: Installing the D20E
Module
Installi ng the D20E Module
This chapter covers the following topics:
Required tools and materials on page 35
Installation process on page 36
Required tools and materials
Before beginning the installation procedures, have the following tools and equipment
available:
Flathead screwdriver with 0.6 x 3.5 mm blade (for terminal block wiring)
#2 Phillips screwdriver (for rack mounting the unit)
Wire cutters (for field wiring)
Wire strippers (for field wiring)
Wire crimping tool (for field wiring)
Tie-wraps (for organizing wiring and cables)
Multimeter (for testing voltages and I/O points)
Needle nose pliers