CHAPTER 3: CONFIGURING THE D20E FIRMWARE
D20E ETHERNET I/O MODULE INSTRUCTION MANUAL GE INFORMATION 49
Delete a project
To delete a project:
1. Open DAPserver Studio.
2. Hover on an existing project from the My Devices section of the DAPserver Studio
main window and select the check-box.
3. Confirm that the project you wish to delete is selected. (that is, a check-mark appears
in the top-right of the device box.
4. Click Delete (trash can).
Result: A message window appears asking if you would like to delete the project you
have selected.
5. Click Yes.
Result: The project is removed from DAPserver Studio.
Configuring D20E modules
This section describes how to configure D20E modules. This comprises how to:
Configure NTP time sync on page 50
Change an existing user’s password on page 51
Change an existing user’s permissions on page 53
For detailed information on configuring the point types, see section Configuring points on
page 55.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Multilin D20E and is the answer not in the manual?

GE Multilin D20E Specifications

General IconGeneral
BrandGE
ModelMultilin D20E
CategoryI/O Systems
LanguageEnglish

Related product manuals