GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 118   Section 5.0 - Gantry Cable Connections
Figure 2-18 Gantry Power Pan Connections
Figure 2-19  TGPG Connections
3.) Install cables to the gantry TGPG.
Note: 4.) Route J9 and J11 cables behind all cables at this area. See Figure 2-20.
HVAC 120V Power Pan
120V Power Input
Ethernet/LAN
Fiber Optic
HVAC 440V
Axial Drive
HVDC