Chapter 1 - Position Subsystems Page 49
1 – Pos. Subsystems
If no damage is found, close this dispatch and continue with the electrical calibration procedures.
If the system is damaged, go to the Equipment Delivery Quality web site and follow their
instructions.
To enter a damaged in shipping claim, go to this web site:
http://egems.med.ge.com/edq/home.jsp
7.5.3 FE Inspection Completion
1.) After the Gantry Bearing Inspection is complete, close the service dispatch with the following
information:
- Gantry Serial Number
- Gantry Type
- System ID
- Site Name
- Installation date
- Was the gantry transported to the site in the shipping crate? (Yes/No)
- Was the gantry lifted or hoisted, were riggers used, or was the gantry delivered via flatbed
wrecker? (Yes/No)
- Number of locations that fail the gap inspection if any: _____
2.) Close the service dispatch.
Should any follow-up be required after this inspection, the site engineer will be contacted directly
by CT Engineering.