GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Chapter 1 - Position Subsystems Page 95
1 – Pos. Subsystems
CONNECTION
OR WALL BOX
AWG
#
CONNECTION FROM CONNECTION TO PDU INSTALLED AND
CHECKED
A1 *1
*1
*1
#1/0
Load - T1
Load - T2
Load - T3
GND
TS-1 L1
TS-1 L2
TS-1 L3
TS-1 GND
(Do NOT connect
anything to neutral
point.)
WL
(Warning light)
#14
#14
#14
#14
#14
#14
#14
#14
LV Source -1
LV Source -2
X-Ray ON Light -1
X-Ray ON Light -2
Sys-ON Light -1
Sys-ON Light -2
Ready Light -1
Ready Light -2
TS6 1
TS6 2
TS6 3
TS6 4
TS6 5
TS6 6
TS6 7
TS6 8
DS (Scan Room
Door Switch)
#14
#14
Door SW-1
Door SW-2
TS6 9
TS6 10
*1: Sub-feeder wire size depends on system input voltage. Refer to Ch. 12 - Power Requirements
in Pre-Installation manual.
Table 1-10 Contractor PDU Connections