The option “CK = RTC+Logical + Mathematical Options”
may be used to configure the device to trigger a series of
actions over time.
The calendar may be set in the EN.FUN menu using the CAL.
EN parameter
As follows:
Weekly: continuous calendar (“WEEKLY” option)
• Single week (“ONE.OF option”): the calendar triggers
events for up to seven days, then switches OFF, while
keeping all information on events and enabling of days
set to ON stored in memory.
The actions that may be scheduled are:
• SW ON (starting up the software, or terminating software
off condition – see paragraph 5.8)
SW OFF (turning off the software - see paragraph 5.8)
START PROGRAMMER 1
STOP PROGRAMMER 1
RESET PROGRAMMER 1 (the programmer goes into
“READY” condition)
START PROGRAMMER 2
STOP PROGRAMMER 2
RESET PROGRAMMER 2 (the programmer goes into
“READY” condition)
SW ON and START PROGRAMMER 1 (if software is of,
software on will be forced, followed by start programmer)
SW ON and START PROGRAMMER 2 (if software is of,
software on will be forced, followed by start programmer)
P.ST12: START programmer time base PROGR.1 and
PROGR.2
P.SP12: STOP programmer time base PROGR.1 and
PROGR.2
P.RS12: RESET programmer time base PROGR.1 and
PROGR.2
TRIGGERED TIME EVENT 1 (as in FB input)
TRIGGERED TIME EVENT 2 (as in FB input)
The TRIGGERED TIME EVENT 1 action and the TRIGGERED
TIME EVENT 2 action are set as input for the LFBs to define
any internal status currently managed by the LFBs. The LFBs
may be used to force statuses (see Function Commands)
Up to 4 events are available for each day of the week;
a single day may be enabled or not, as required.
Warning: in a ONE WEEK calendar, at midnight,
the previous day is considered completed
in terms of the associated events, which will
therefore no longer take place, even if the day
is still enabled. In the event of a power supply
failure and return, events associated with the
days during which the power supply was off will
remain active.
The calendar can only be configured using the GF_eXpress
tool:
Select everything you need to set scheduled events in the
WEEKLY CALENDAR:
Enable single week or weekly calendar
Enable day of the week
4 events
Hour, minute and second when the event will be triggered

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the gefran 1650 and is the answer not in the manual?

gefran 1650 Specifications

General IconGeneral
Brandgefran
Model1650
CategoryTemperature Controller
LanguageEnglish

Related product manuals