Constellation™ 2002 June 20
I-8
parts, ordering 13-1
PC with emulator, setting up B-2
Performance submenu
hidden menu B-8
Performance submenu, Keypad menu B-8
period, warranty 13-7
physical layer 8-2
pilot signal D-1
PILOT, EXTERNAL, command,
Configuration submenu B-10
pinouts A-10
AUX connector A-10
CAN connector A-10
DE-9 connector A-11
DS1 connector A-12
Ethernet connector A-10
FarScan connector A-11
Keypad B-3
Keypad connector A-10
MONITOR connector A-10
RJ-11 connector A-11
RJ-45 B-3
RJ-45 connectors A-10
SPUR connector A-10
T1/E1 wayside connector A-10
VersaT1lity connector A-10
VF Port connector A-10
platform, Constellation Radio 1-3
Port Setup 10-6
power
top of the rack 4-30
, 9-8
turning on 4-7
power breaker
off 4-9
power cable 4-21
power calibration B-12
power distribution panel 4-23
power levels
recording 4-32
, 9-9
power meter 4-3
, 4-7, 12-3, 12-13, 12-14
power meter, connecting to ACU 4-28
, 9-6
power output
verifying 4-7
power precautions 4-2
power runs 4-21
power sensor 4-3
Power Supply 1-4
, 4-24, 9-3
failure 12-22
front view 12-21
installing 12-22
LED indicators, location 12-21
removing 12-22
switch location 12-21
turning on the switch 4-7
, 4-23
Power Supply A1, replacement precaution
11-3
, 12-2
precaution
waveguide 2-2
precautions 12-1
electrical 2-1
power 4-2
radiation hazard 2-2
safety and equipment damage 2-1
simultaneous replacement of modules
11-3
, 12-2
procedure
adjusting the RF output power 4-30
, 9-
8
measurements 9-3
traffic-affecting 4-28
, 9-6
procedures
installation 4-6
product support 13-1
Product Support Engineer 13-5
product update information F-5
product warranty terms 13-7
PROTECT command
M12 Unit 12-34
protection
M12 Unit 6-5
protection switching 1-13
protection system
verifying 4-8
protocol layers 8-2
publications, related 1-2
Purchase Order Number 13-4
R
rack
grounding 4-6
, 4-9
rack installation 4-9
rack, location of equipment 3-1
rack-grounding cable 4-2
radiation hazard 2-2