SITE PREPARATION
C HAPTER
3
SITE PREPARATION
Power Source
DC power source, 20 V to 60 V.
Equipment Rack Location
The equipment rack should be located in a sheltered area that provides proper
lighting, ventilation, and access to both the front and back of the Constellation
radio.
At least 3 feet of space must be between the equipment, strong magnetic fields,
and sources of impulse noise.
Equipment Inspection
Verify that the correct radio system is going to be installed.
Each Constellation radio has been set up at the factory according to the
customer’s specifications. To configure a radio for a different
application, contact the Harris MCD
Technical Assistance Center
(TAC). See page 1.
The Constellation radio is shipped fully assembled and ready to install.