Constellation™ 2002 June 20
I-12
traffic-affecting procedure 4-28, 9-6,
12-12
training centers 13-7
training, customer 13-6
telephone numbers 13-6
transmit monitor port
ACU 4-19
connecting power meter 4-28
, 9-6
location 4-29
, 9-7
Transmitter Assembly 1-4
ATPC enabled 1-14
front view 12-8
installing 12-12
log form F-3
MCX connector 12-10
measurements 9-1
, F-3
measuring the reference frequency 4-7
off-line, measuring power 4-28
, 4-32,
9-6, 9-9
power level 12-14
record operating frequency 4-24
, 9-3
removing 12-12
removing and installing multiplier-filter
12-10
switch 4-25
, 9-5, 12-9, 12-13
test points, location 4-25
, 9-5, 12-9
torque specification 4-25
, 9-5, 12-9,
12-13, 12-16
Transmitter Assembly A1, replacement
precaution 11-3
, 12-2
transmitter filter 4-24
, 9-3
transmitter measurements record 4-1
transmitter power, request for increased
1-14
Transmitter switch, turning on 4-7
, 4-23
Transmitter, temperature reading B-7
transmitter, termination of 2-2
trap
community 8-10
destinations 8-9
enable/disable 8-10
management 8-10
repeat 8-10
tributary BER test 5-11
tributary loopback test 5-3
tributary remote loopback test 5-4
troubleshooting
guidelines 11-1
turning on
the power 4-7
the Power Supply switch 4-7
, 4-23
Transmitter switch 4-7
, 4-23
twisted-pair cable 8-2
two separate loop systems D-5
U
unpacking procedure 3-2
unrepairable units 13-3
V
verify grounding 2-2
verifying RF output power 4-7
VersaT1lity port 10-3
, A-9
location 4-13
, A-8
pinouts A-10
version, software 11-1
VF port 10-3
VF ports
location 4-13
, A-8
pinouts A-10
voltmeter, digital 12-3
VT100 terminal emulator B-1
VT100-compatible terminal 1-16
W
warming up the Constellation 4-7, 4-23
warning labels 2-1
warnings 2-1
warranty 13-1
other equipment manufacturer 13-7
warranty period 13-7
watchdog 10-10
waveguide
flexible 4-20
grounding 4-19
installing 4-19
leaks 4-20
precaution 2-2
waveguide termination 4-19
wayside connector 10-3
wayside port
E1 specification A-11
E1, location 4-13
, A-8
T1, location 4-13
, A-8
T1/E1 pinouts A-10