6.6 Performing Demand Measurement
Performs demand measurement, which repeats integration mea-
surement at every demand interval.
6.6 Performing Demand Measurement
• The display shows the demand at every interval (previous
value), the integrated power within each interval (latest value),
the maximum demand from the start of time-series measure-
ment, and the time of occurrence.
• When the reactive-power-meter method is OFF, the display
does not show the lead (WQ-) values of the integrated reactive
power.
• When multiple circuits are measured, use the
F2
(CIRCUIT)
key to display data of other circuits.
Set the measurement start/stop methods, interval, medium for
saving data, and data output items on the measurement setting,
data-output setting, and save/print items setting screens.
❖
5 Setting Procedure (page 55)
Press the
MEASURE
key to display the measurement screen.
Press the
F1
(SCREEN) key to display the selection window.
Select "
DEMAND
" using the cursor key.
Press the
F1
(select) key to show the demand display screen.
Press the
START/STOP
key to start demand measurement.
Changes the circuit to display
(when multiple circuits are measured).
NEXT
SCR
SCREEN
select