1.5 Measurement Flowchart
The measurement workflow is described below.
1.5 Measurement Flowchart
Measurement
Preparations (
⇒ p.25)
1. Attaching the strap
2. Check the instrument's
remaining battery power
3. Connecting the test lead
4. Turning the power on
5. Setting clock
Setting Range
(⇒ p.36)
1. Setting the resistance range
2. Setting the voltage range
• When you want to stabilize
measurement values:
(⇒ p.73)
• When you want to set threshold
values by which to judge mea-
surement values:
(⇒ p.55)
• When you want to hold mea-
surement values:
(⇒ p.44)
• When you want to store mea-
surement values:
(⇒ p.75)