EasyManua.ls Logo

Hioki ST5520-01 - Setting The Test Duration And Response Time; Setting the Test Duration and Response Time; Setting How Long to Apply the Test Voltage

Hioki ST5520-01
201 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
Setting the Test Duration and Response Time
3.4 Setting the Test Duration and Response
Time
Setting how long to apply the test voltage
The test duration determines how long the test voltage will be applied.
The same test duration is applicable at any test voltage.
IMPORTANT
In the auto range, if the test duration is set to a short time period, a test may
nish without displaying a measured value because of a range shift. If the auto
range is used, check the time required for a measured value to stabilize and set
the test duration.
The measured resistance can become low over time depending on the equipment
to be measured. (Example: When the terminal to ground capacity is large, etc.)
Setting an improper test duration could result in erroneous judgment. Carefully
check the time required for a measured value to stabilize and set the test
duration.
Measured values may not stabilize due to the humidity and other environmental
factors. Check how long it takes measured values to stabilize and then set the
test duration accordingly.
1
Open the Settings screen.
Select [SET].
2
Set [TIMER] to [ON].
Selection (Up/Down
keys)
[ON]
[OFF]
Cancel the change.
10
9
8
7
6
5
4
3
2
1