50
Starting Measurements
• A test can be started or completed by the EXT.I/O, RS-232C, and switched probe
in addition to the operation keys. A test can be started and completed by different
methods.
• Check that the test leads are securely connected before starting a test.
• A test does not start when the EXT.I/O STOP signal is LOW.
• A test does not start when the interlock function is enabled.