ATTENTION 
Changes to parameters in the controller can be made from the Monitoring 
tab. Refer to the Changing Parameters while Monitoring  section in the 
Control Building User’s Guide. 
 
 
 
6.3 
Load components from Project 
Loading C300 Controller 
Use the following general procedure to load a C300 Controller. The load procedure is 
similar for all controller components. 
 
Prerequisites 
 
Control Builder is running 
 
This procedure assumes that the C300 Controller is installed and capable of 
communicating with the Server. 
 
Considerations 
Note that selecting a C300 Controller block for loading also selects the associated 
CEEC300 block and IOLINK blocks. 
All illustrations used in the procedure are for example purposes only. 
To load a C300 Controller block and its associated blocks, perform the following steps. 
 
Click Tools > Load. Or, click the    
load button in the toolbar. 
 
Also, you can right click on the C300 
block icon to select Load.