EasyManua.ls Logo

HPE ProLiant DL325 Gen10 Plus

HPE ProLiant DL325 Gen10 Plus
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Extending the server from the rack
To perform this procedure, you will need a T-25 screwdriver.
WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately
stabilized before extending a component from the rack.
Procedure
1.
To fully extend the long chassis server with the cable management arm, do the following:
NOTE: If the cable management arm option is installed for a short chassis server, you can extend the server without
powering down the server or disconnecting peripheral cables and power cords.
a.
If installed,
remove the bezel.
b.
Power down the server.
c.
Disconnect all peripheral cables and power cords.
d.
Remove the cables from the cable management arm.
Operations
29

Table of Contents

Other manuals for HPE ProLiant DL325 Gen10 Plus

Related product manuals