8. Slide the server in the rack.
9. If removed, install the bezel.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise
website.
Installing a uFF drive and SCM drive carrier
For the supported drive bays, see Drive bay numbering.
Procedure
1. If needed, install the uFF drive into the drive carrier.
2.
To install a drive in outer drive cage, remove the bezel If installed.
3.
To install a drive in inner drive cage, do the following:
NOTE: If the HPE designated cable management arm is not installed on the rack, ensure that the cables at the rear of
the server are not damaged while extending the server.
a.
Extend the server from the rack.
b.
To open the inner drive cage, press the cage latches.
The drive cage pops out of the chassis in the slanting position.
Hardware options installation
69