c. Turn the captive screw to 180 ° (callout 2).
d. Push the screw handle down in horizontal position (callout 3).
8. Install the access panel.
9. Install the server into the rack.
10.
Connect all peripheral cables to the server.
11.
Connect each power cord to the server.
12.
Connect each power cord to the power source.
13.
Power up the server.
14.
If removed, install the bezel.
The installation is complete.
Installing the secondary full height PCIe riser cage
When installed, this riser cage supports full-height, half-length expansion boards. PCIe slot 2 is no longer available.
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1. If installed,
remove the bezel.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6. Remove the access panel.