EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 145

HPE ProLiant DL325 Gen11
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Hold the lift tabs and pivot the rail frame to the closed position.
A click sound indicates that the rail frame is properly engaged.
3. Close the retention frame:
a. When using a torque wrench to tighten the retention frame screw, set a torque between 1.24 N-m (11 lbf-in) to 1.47 N-m (13 lbf-in) .
b. Pivot the spring loaded retention frame downward and hold it down (callout 1).
c. Tighten the retention frame screw (callout 2).
HPE ProLiant DL325 Gen11 Server Maintenance and Service Guide 145

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals