Remove the secondary riser cage blankRemove the secondary riser cage blank
About this taskAbout this task
CAUTION:CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the server
when a port blank is removed without the corresponding I/O port option installed.
CAUTION:CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any installation, removal, or
replacement procedure. Improper grounding can cause electrostatic discharge.
ProcedureProcedure
1. Power down the server.
2. If installed, open the cable management arm.