7. If removed, install the liquid cooling heatsink .
8. Install the air baffle and other removed hardware components.
9. Install the access panel.
10. Install the server into the rack.
11. Connect all peripheral cables to the server.
12. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
13. Power up the server.
Expansion card replacementExpansion card replacement
SubtopicsSubtopics
Removing and replacing the expansion cardRemoving and replacing the expansion card
Removing and replacing the expansion card from the HPE NS204i Boot Device riser cageRemoving and replacing the expansion card from the HPE NS204i Boot Device riser cage
Removing and replacing the expansion cardRemoving and replacing the expansion card
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this taskAbout this task