EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - About this task; Procedure

HPE ProLiant DL325 Gen11
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T-20 Torx screwdriver
Hex screwdriver—This tool is required if the serial port cable is to be installed.
Thermal grease
About this taskAbout this task
CAUTION:CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
ProcedureProcedure
1. Install the new system board assembly:
a. Align the system board assembly to the openings on the rear panel (callout 1).
b. Push the system board assembly till it locks on the chassis and rear panel.
c. Tighten the thumbscrew (callout 2).
2. Remove the rail frame cover:
a. While holding the sides of the retention frame, loosen the frame screw (callout 1).
This retention frame is spring-loaded. Once the screw is loosened enough, hold the retention frame as it automatically pivots to a
vertical position (callout 2).
HPE ProLiant DL325 Gen11 Server Maintenance and Service Guide 212

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals