EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 161

HPE ProLiant DL325 Gen11
298 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Disconnect all peripheral cables from the server.
6. Remove the server from the rack.
7. Place the server on a flat, level work surface.
8. Remove the access panel.
9. Disconnect the boot device signal and power cables from the system board .
10. Remove the boot device cage assembly:
a. Remove screws from the riser cage (callouts 1 and 2).
Retain the screws. These screws will be used to secure the new boot device cage assembly.
b. Pull the cage assembly from the slot (callout 3).
11. Disconnect the signal and power cables from the boot device.
12. Remove the boot device carrier:
a. Press and hold the carrier latch (callout 1).
b. Pivot the latch to open (callout 2).
c. Slide the carrier out from the boot device cage (callout 3).
HPE ProLiant DL325 Gen11 Server Maintenance and Service Guide 161

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals