Step 3 Remove the failure smart ETH gateway from the guide rails.
Figure 5-53 Removing the smart ETH gateway
Step 4 Install the reserved smart ETH gateway in the original position and connect the
cables.
Step 5 On the WebUI of the ECC800-Pro, choose Monitoring > System > ECC800 >
Controls > Delete device with communication failure, and click Submit.
Step 6 Log in to the ECC800-Pro WebUI, and edit the plan view by adding new devices.
Step 7 Check the parameters and communication status of the smart ETH gateway to
ensure normal communication.
----End
5.4.6 Replacing the WiFi Module
Impact on the System
The app cannot be connected to the ECC800-Pro, and the smart module
information cannot be properly displayed.
Preparations
Material: WiFi module
Procedure
Step 1 Remove the old WiFi module from the USB port on the ECC800-Pro.
Step 2 Install the spare WiFi module in the original position.
Step 3 Log in to the ECC800-Pro WebUI.
FusionModule2000 Smart Modular Data Center
Maintenance Guide (Fusion Module Actuator) 5 Parts Replacement
Issue 01 (2020-12-25) Copyright © Huawei Technologies Co., Ltd. 101

Table of Contents

Other manuals for Huawei FusionModule2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei FusionModule2000 and is the answer not in the manual?

Huawei FusionModule2000 Specifications

General IconGeneral
BrandHuawei
ModelFusionModule2000
CategoryStorage
LanguageEnglish

Related product manuals