Step 3 Select the failure device in Source Device, select the reserved device in Target
Device, and click Submit to synchronize the conguration parameters of the
failure device to the reserved device.
----End
5.2 Replacing Power Supply and Distribution System
Components
5.2.1 Parts Replacement for the Precision PDF
For details about parts replacement for the precision PDF, see the "Parts
Replacement" section in the corresponding Precision PDC user manual.
Table 5-2 Replaceable parts of the precision PDF
No. Replaceable Part
1 MCB (Miniature circuit breaker)
2 MDU (Monitor display unit)
3 SPD (Surge protective device)
4 Fuse
5 Indicator
6 Power distribution detection module
NO TE
If you need to replace any other parts, contact Huawei technical support.
5.2.2 Parts Replacement for the Integrated PDC
For details about parts replacement for the integrated PDC, see the "Parts
Replacement" section in theECC800-Pro user manual.
Table 5-3 Replaceable parts of the integrated PDC
No.
Replaceable Part
1 MCB
2 MDU
3 SPD
4 Fuse
FusionModule2000 Smart Modular Data Center
Maintenance Guide (Fusion Module Actuator) 5 Parts Replacement
Issue 01 (2020-12-25) Copyright © Huawei Technologies Co., Ltd. 60

Table of Contents

Other manuals for Huawei FusionModule2000

Related product manuals