Step 6 (Optional) Install the removed Micro SD and SIM card in the corresponding slot of
the new ECC800-Pro main control module.
Figure 5-5 Installing the Micro SD and SIM card
Step 7 Install the spare ECC800-Pro main control module in the ECC800-Pro subrack and
tighten the screws on both sides of the ECC800-Pro main control module.
Step 8 Connect the communications cables and antennas to the ECC800-Pro main control
module.
Step 9 Choose Maintenance > Conguration File and import the backup conguration
le,
 or set parameters for the devices that connect to the ECC800-Pro to ensure
normal communication.
----End
5.4.1.2 Replacing an ECC800-Pro PSU
Prerequisites
Do not touch the terminals in the rear of a removed PSU to avoid electric shocks.
● Tool: insulation gloves
● Materials: a reserved undamaged and undeformed PSU of the appropriate
model.
Context
The PSU is hot-swappable.
Procedure
Step 1 Push the locking latch in the upper right corner of the PSU panel leftwards.
Step 2 Pull out the handle of the PSU to remove the PSU from the subrack.
Step 3 Gently push the reserved PSU into the subrack along guide rails, and push the
locking latch rightwards to secure the handle.
FusionModule2000 Smart Modular Data Center
Maintenance Guide (Fusion Module Actuator) 5 Parts Replacement
Issue 01 (2020-12-25) Copyright © Huawei Technologies Co., Ltd. 67