Preparations
● Tools: ESD gloves, label, marker
● Material: smart U space manager
Figure 5-86 Smart U space manager installation diagram (main control box
attached to the top of the cabinet interior)
(1) Fastener (2) UIM20A Expansion Module (3) Main control box
(4) Asset detection strip (42 U
detection point)
FusionModule2000 Smart Modular Data Center
Maintenance Guide (Fusion Module Actuator) 5 Parts Replacement
Issue 01 (2020-12-25) Copyright © Huawei Technologies Co., Ltd. 131