Parameter Description
Rated Power(kW) Set the genset power to prevent genset overload and
system breakdown when ESSs are charged.
Genset Startup
SOC(%)
The value of Genset Startup SOC(%) must be at least
10% greater than the value of End-of-Discharge SOC for
Lithium Batteries(%).
Genset Shutdown
SOC(%)
The genset shuts down when the ESSs charge to the value
of Genset Shutdown SOC(%).
Figure 6-22 Setting lithium battery parameters
Networking Scenarios
NO TE
If an ATS without overvoltage/undervoltage protection is used, the ATS may make
misjudgment due to overvoltage/undervoltage of the power grid. To ensure the power
supply quality, install an AVR before the ATS.
Figure 6-23 Single system networking
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 Application Scenarios
Issue 06 (2023-04-24) Copyright © Huawei Digital Power Technologies Co., Ltd. 68