EasyManua.ls Logo

Huawei NetCol5000-A035 - Page 5

Huawei NetCol5000-A035
244 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 11 (2018-03-23)
Added a base drawing.
Issue 10 (2017-05-28)
Modied descriptions about the teamwork networking and monitoring.
Issue 09 (2016-09-15)
Modied the name of the needle.
Issue 08 (2016-06-30)
Added the cable connections for teamwork control in the smart ETH gateway
scenario.
Modied descriptions about the leather hose tolerance range and the pipe
support.
Issue 07 (2016-04-15)
Added the refrigerant charging requirement of NetCol500-A036.
Modied descriptions about the teamwork networking and monitoring, installing
enclosure frames and upper frames, and connecting signal cables.
Issue 06 (2015-07-02)
Modied the requirement of leak checking, vacuuming, and partially charging
refrigerant.
Issue 05 (2014-11-27)
Added reducing valve requirement when leak checking.
Issue 04 (2014-10-30)
Modied the following expressions:
Added table 5-9.
A cold aisle temperature and humidity sensor was congured in section 3.1.2.
Issue 03 (2014-09-09)
Modied the expression frame of section 5.
Issue 02 (2014-07-07)
Modied some note descriptions in section 4.4.2.
NetCol5000-A(025, 035) In-row Air Cooled Smart
Cooling Product
User Manual (600 mm Width) About This Document
Issue 17 (2020-10-22) Copyright © Huawei Technologies Co., Ltd. iv

Table of Contents

Other manuals for Huawei NetCol5000-A035

Related product manuals